product

Decentralized implementation of flood resilience measures – a blessing or a curse?

lessons from the Thames Estuary 2100 Plan and the Royal Docks regeneration


Description

This article presents a case study on the implementation of the Thames Estuary 2100 Plan in the Royal Docks, a regeneration project in the East of London. On paper, the Thames Estuary 2100 Plan advances the shift from traditional flood control to flood resilience, because of its long-term horizon, estuary-wide approach, and emphasis on floodplain management. In practice, however, we identify three frictions between vision and reality: a lack of local ownership of the plan, a lack of clear guidance for floodplain management, and limited capacities with local authority. These frictions suggest an ongoing ‘public-public divide’ in decentralized governance.



Publication date

Type

Document (PDF)

Right Of Use
Unknown
Access Rights

Not known